Wastewater Treatment Plant

The Tribal water reclamation facility was designed to treat up to 750,000 gallons per day utilizing an OMNIFLO interchange sequencing batch reactor (SBR) system with a 900 mg/l biological oxygen demand load. Included in the design was the Cannibal Solids Reduction system. This system produces a low sludge yield of .05 to .25 lbs. of biological solids per pound of BOD. The operational flexibility and significant power cost savings of this facility has proven to be an industry leader compared to installing an aerobic digester and large sludge drying beds. The plant is operated daily by the Tribe and Veolia Waters. 

 

Wastewater Plant Information:

Office Hours: Monday thru Sunday 7:00am-4:00pm

Address: 51970 Seminole Dr. Banning Ca 92220

Mailing Address P.O. Box 861 Cabazon, Ca 92220

Contact Numbers: (951-755-5274) Emergency (951-755-5270)